Yes. The method is the same on every project, from Alfragide to Beja, with our own team and certification delivered on every one for 11 years.
Structured cabling
Every structured cabling project begins with an on-site survey, before the quote. Points are counted against the future layout, cable is CAT6 or CAT6A depending on distance and service life, and optical fibre links buildings where copper cannot reach. At the end, we deliver the Fluke certification of every point in a report.
The works are carried out with the company still working: in phases, zone by zone and out of hours when there is no alternative.
Business Wi-Fi
Business Wi-Fi networks begin with on-site coverage measurement, never estimated from a floor plan. Access points cabled with PoE, Wi-Fi 6 and Wi-Fi 7, seamless roaming and a separate guest network. Because management is centralised, most corrections are made remotely.
DataRoad IT Unlimited
Talk to DataRoad. We assess your operation and propose the right plan.
Request a proposal →