Blackout-proof network infrastructure: what 28 April taught businesses

More than 8 hours without power in Lisbon on 28 April 2025. How to design the network, redundant internet and critical systems so the business keeps working.

Updated 18 October 20266 min readDataRoad - IT Services and Consulting

At a glance

For decision-makers short on time.

  • 01Protect the backbone: UPS for the network, not for the whole office.
  • 02Real redundancy means independent paths: second carrier and, ideally, satellite.
  • 03A one-page continuity plan, tested once a year, keeps the team working.
In this article
Preparar a empresa para um apagão: UPS, internet redundante, Starlink e um plano de uma página — DataRoad

A company withstands a blackout when its network infrastructure has its own power, two or three independent paths to the internet and its critical systems outside the office. On 28 April 2025, the power went at 11:33 and, in Lisbon, only began to come back at 20:12. Drawing on that day, this article shows what should stay switched on, how to design genuinely redundant internet and how to fit it all into a one-page plan.

Four takeaways

  • More than 8 hours That is how long Lisbon waited for electricity after the 11:33 outage.
  • Cascade effect ANACOM, Portugal's communications regulator, concluded that the power failure affected mobile and fixed networks; a backup of the same type can go down with the main line.
  • The backbone first UPS for the network, internet over independent paths (including satellite), critical systems in the cloud or a datacentre and phones that ring anywhere.
  • One page, one test a year The plan fits on a single sheet and is only worth anything if it is rehearsed.

Timeline of a day without electricity

TimeWhat happened
11:33Total outage across mainland Portugal and Spain. ENTSO-E records the incident at 12:33 Central European Time.
During the dayExtraordinary Council of Ministers and declaration of an energy crisis, in force until 23:59 the following day. The system is restarted from the Castelo do Bode and Tapada do Outeiro power stations.
19:25Restoration begins in Porto, according to the chairman of E-Redes at a parliamentary hearing.
20:12Restoration begins in Lisbon.
End of the 28thAround 95% of customers have power again.
03:00 on the 29thRestoration complete.

In that interval, many companies discovered that their server was off, the internet was down, the landlines were silent and nobody had the authority to decide. ANACOM's report to the Government recommended assessing the autonomy of batteries and generators and setting minimum autonomy times for network equipment. For a company, the conclusion is straightforward: two contracts using the same technology are not redundancy.

Protect the backbone, not the whole office

Keeping 40 desktop computers running for 8 hours makes no sense. What makes sense is keeping the network, the connection to the outside world and the systems where the work lives running — and letting the rest switch off.

ComponentWhy it mattersRecommended protection
Router, firewall, core switch and Wi-Fi access pointsLaptops keep network and internet accessA UPS dedicated to the network, sized for several hours
InternetEmail, cloud and contact with clientsMain fibre + a second independent path (another carrier, 4G/5G and, ideally, satellite)
Server and filesDocuments and applicationsCloud or external datacentre; local server with UPS and automatic shutdown
PhonesClients can still reach youCloud phone system, with a mobile app and call forwarding
Laptops and mobile phonesWorking from anywhereCharged batteries, power banks and secure remote access already configured

The role of the UPS, explained without jargon

A UPS is a battery that kicks in the instant the mains supply fails. It keeps the essentials running for a while and allows servers to be shut down without corrupting data. A UPS designed for 10 minutes will not last 8 hours: you choose it by how long you want to hold out, and only for the equipment that counts.

A typical sizing

Example — an office with 25 people on laptops and a local file server. The network UPS powers only the router, firewall, core switch, two Wi-Fi access points and the satellite dish. The server has its own UPS that shuts it down safely after 15 minutes. The team keeps email and cloud for the planned hours and the server starts up afterwards without damage — for far less than it would cost to protect the whole office.

Truly redundant internet: paths with no common weak point

There is only redundancy when the failure of one path does not drag the other down with it. Two fibres from the same carrier coming in through the same duct do not count.

  1. Main fibre — your primary carrier.
  2. Second carrier — preferably using a different technology.
  3. Satellite — for those who cannot stop, a link such as Starlink depends less on local terrestrial infrastructure and, with a UPS, keeps the office online when local networks fail.
  4. Managed firewall — decides on its own, within seconds, which path traffic takes when one goes down.

The options are covered in detail in our article on business internet speed and redundancy.

In practice: ReStream's office in Cascais

ReStream, a Texas-based technology company and a global leader in multi-platform live streaming, entrusted its Cascais office to DataRoad. The network now has layer 3 PoE switches at the core, Wi-Fi 6, an enterprise firewall, a Starlink link for a robust and redundant connection and permanent monitoring, all managed under an IT Unlimited contract. For a business that lives by being live, the question "what if the internet goes down?" had to be answered before it was asked — and every SME should ask it.

DataRoad IT Unlimited

Talk to DataRoad. We assess your operation and propose the right plan.

Request a proposal →

We practise what we preach: the DataRoad datacentre

We recommend what we use. DataRoad's datacentre has redundant internet, Starlink and advanced renewable energy systems, and it is from there that international clients work remotely. This is the foundation of our remote working and mobility solutions, designed for companies that have to keep going when the office closes.

The one-page plan: six questions

A business continuity plan does not need 80 pages. For a blackout, one printed sheet covers the essentials:

  1. Who decides? — the name and mobile number of whoever declares blackout mode, and a deputy.
  2. How do we communicate? — a defined messaging group and a contact list on paper.
  3. What stays on, and for how long? — the list in the table above, with the real autonomy of each UPS.
  4. Where does the team work? — at home, another office or a space with power, with remote access already tested.
  5. What do we tell clients? — a template message ready for email, website and social media.
  6. How do we come back? — the start-up order for equipment and confirmation that backups ran, following the method in our guide to backup and disaster recovery for SMEs.

A plan that has never been tested is just an assumption. Once a year, at the end of the day, cut the power to the network and watch what happens.

How DataRoad prepares your network

Under IT Unlimited contracts, we size the UPS units, configure redundant internet with automatic failover and monitor the equipment — we know an office has lost power before the client calls. For those who cannot stop out of hours, the IT Unlimited Premium 365 plan covers nights, weekends and public holidays. Our head office is in Alfragide and our support reaches the whole country.

Frequently asked questions

How long did the blackout of 28 April 2025 last?

It began at 11:33. According to E-Redes, in Lisbon restoration started at 20:12 and finished at 03:00 the following day; by the end of the 28th, around 95% of customers had power. The duration varied considerably between areas.

Will a 4G/5G router do as backup internet?

It will for ordinary faults, such as a cut fibre. In a prolonged blackout mobile networks can also fail, as ANACOM concluded. For those who cannot stop, satellite connected to a UPS is the most robust complement.

Do we need a generator?

It depends on the autonomy you want and what has to stay on. For network and internet over a few hours, a properly sized UPS is usually enough. Local servers, refrigeration or heavy equipment over many hours do justify a generator.

Does having everything in the cloud solve it?

It solves half of it. The data remains accessible, but the team still needs power and internet to reach it. Cloud without redundant internet is a secure safe whose door you cannot open.

Next step: a blackout resilience test in 10 working days

We assess UPS units, internet connections, critical systems and how the team works without power, and deliver the one-page plan with priority fixes. No-obligation proposal. More than 10 workstations · support contract · remote, on-site and telephone support.

Sources

DataRoad · IT Services and Consulting

One StepAhead of IT.

Portugal’s premium IT brand for international companies: one partner, one contract and one security standard for every office, in Portugal, Europe and the US.

  • 232clients in Portugal and abroad
  • PT · EU · USremote and on-site support
  • 5,052 Google reviews

We do IT right.

DataRoad IT Unlimited

Want a network and IT that simply work?

Talk to DataRoad. We assess your operation and propose the right plan.

Request a proposal, no commitment →+351 211 459 950**Call to a Portuguese landline · More than 10 workstations · support contract · remote, on-site and phone support